Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0221

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 07-Sep-2026 20:21 BD time
100%Form Completion 14/14Checklist OK 1Open Snags 1Total Snags 4Photos Attached

Site & Handover Details

Site CodeSYL_X0221ZoneSylhet
HOTO Date2026-09-05DistrictSunamganj
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonMd. AnwarTakeover PersonMd. Ismail Hossain
Handover Phone01734713807Takeover Phone01847426858
Inspected ByIsmail SirajiSecurity GuardYes
Access Key Handed OverYesSite TypeGFT
BTS TypeIndoor
Shared with OperatorNoShared Operator NameN/A

Generator Information

DG BrandFG WilsonGenset Asset No.2003001Y2G1
Capacity (KVA)30TypeCan
Fuel Tank Capacity2000Present RH5653
Fuel (no water)189 LFuel (total)256 L
Water Amount67 LFuel Amount (word)Two Hundred Fifty Six Liters
DG Site TypeStandardDG Locked After FuelingYes
DG Present StatusOK Genset ON AlarmOK
Battery BrandHamkoBattery SerialV1H24880705
Battery AH100Engine SerialDJ32015-S0099220
ATS BrandGhaddarATS ModeAuto
RH Meter TypeDigital from controllerLast Service Date2026-04-30
Key TypeLocal KeyKey Status β€” BTSLocal
Key Status β€” DG RoomLocal
Active DG1Connected Fuel Tanks1
Faulty/Disconnected DGFaulty/Disconnected Tanks

Connected Generator Checklist & Readings

ItemValueItemValue
Earth Connection OKYesLoad Current (A)72
Frequency (Hz)49.3Phase3 Phase
Output400Engine BrandPerkings
Voltage L1-L2403Voltage L2-L3404
Voltage L3-L1403Voltage L1-N232
Voltage L2-N233Voltage L3-N232
Current Line 124Current Line 234
Current Line 316N-G1.21
Controller StatusOKBlack Smoke StatusOK
DG Battery ChargerOKATS Physical & Functional StatusOK
DG Automation (VDTC/RVDTC/Rectifier) per BL StandardOKFuel Preserved at Safe & Appropriate LocationOK
Exhaust Fan / Ventilation Sufficient When RunningOKSufficient Water in Radiator & BatteryOK
DG Radiator ConditionOKDG Battery ConditionOK
DG Runs in Both Auto & Manual ModeOKGENSET ON Alarm Functioning ProperlyOK
DG RH Meter Working ProperlyOKNo Parts Missing (if missing, note in snags below)OK

Snags Found (1)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-063 DG DG - Other water pump leakage Faulty Open

Deficiencies & Safety Remarks

DG Major Deficiencies
Safety Remarks
General Remarks

Site Photos


Site / Nameplate

DG RH / Meter

Fuel Gauge
Md. Anwar
Handed Over By · Dhaly Infratech
01734713807
Date:  
Md. Ismail Hossain
Taken Over By · Alliance Computers Limited
01847426858
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (4)

Full-size reference photos for SYL_X0221, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (3)

Photo 1 β€” Site / Nameplate
Photo 2 β€” DG RH / Meter
Photo 3 β€” Fuel Gauge

Snag Evidence Photos (1)

Photo 4 β€” S-063 β€” water pump leakage

Download / Print PDFEdit Before Printing