Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0105

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 07-Sep-2026 20:23 BD time
73%Form Completion 15/15Checklist OK 3Open Snags 3Total Snags 23Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing.

Site & Handover Details

Site CodeSYL_X0105ZoneSylhet
HOTO Date2026-09-03DistrictMoulavibazar
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonSayedTakeover Person01716332171
Handover Phone01716332171Takeover Phone01847426870
Inspected Bysourov sarkarSecurity GuardYes
Access Key Handed OverYesSite TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name

Generator Information

DG BrandPramacGenset Asset No.No
Capacity (KVA)22TypeCan
Fuel Tank Capacity1000Present RH277
Fuel (no water)248 LFuel (total)248 L
Water Amount— LFuel Amount (word)Two Hundred Forty Eight Liters
DG Site TypeStandardDG Locked After FuelingYes
DG Present StatusOK Genset ON AlarmOK
Battery BrandRahim AfrozBattery Serial328TA12749902
Battery AH100Engine SerialN844L2216M5260
ATS BrandLocalATS ModeAuto
RH Meter TypeDigital from controllerLast Service Date2026-08-15
Key TypeMaster Key - AbloyKey Status β€” BTSAbloy
Key Status β€” DG RoomAbloy
Active DG1Connected Fuel Tanks1
Faulty/Disconnected DGFaulty/Disconnected Tanks

Connected Generator Checklist & Readings

ItemValueItemValue
Earth Connection OKYesLoad Current (A)25
Frequency (Hz)50.7Phase3 Phase
Output25Voltage L1-L2390
Voltage L2-L3400Voltage L3-L1405
Voltage L1-N210Voltage L2-N220
Voltage L3-N205Current Line 18
Current Line 29Current Line 38
Engine BrandPerkins Controller StatusOK
Black Smoke StatusOKDG Battery ChargerOK
ATS Physical & Functional StatusOKDG Automation (VDTC/RVDTC/Rectifier) per BL StandardOK
Fuel Preserved at Safe & Appropriate LocationOKExhaust Fan / Ventilation Sufficient When RunningOK
Sufficient Water in Radiator & BatteryOKDG Radiator ConditionOK
DG Battery ConditionOKDG Runs in Both Auto & Manual ModeOK
GENSET ON Alarm Functioning ProperlyOKLub Oil Status (Level & Colour)OK
DG RH Meter Working ProperlyOKNo Parts Missing (if missing, note in snags below)OK

Snags Found (3)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-040 DG DG - Other (unspecified) Faulty DG canopy open due to hi temp issue, need to DG health check Open
S-041 DG DG - Other (unspecified) Faulty ABC Faulty Open
S-042 General Other/Uncategorized (unspecified) Faulty DG Room roof tin faulty Open

Deficiencies & Safety Remarks

DG Major DeficienciesDG Canopy open due to DG high temperature issue, need to Check
Safety Remarks
General Remarks

Site Photos


Site / Nameplate

DG RH / Meter

Fuel Gauge

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional
Sayed
Handed Over By · Dhaly Infratech
01716332171
Date:  
01716332171
Taken Over By · Alliance Computers Limited
01847426870
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (23)

Full-size reference photos for SYL_X0105, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (3)

Photo 1 β€” Site / Nameplate
Photo 2 β€” DG RH / Meter
Photo 3 β€” Fuel Gauge

Snag Evidence Photos (3)

Photo 4 β€” S-040 β€” (unspecified)
Photo 5 β€” S-041 β€” (unspecified)
Photo 6 β€” S-042 β€” (unspecified)

Additional Photos (17)

Photo 7 β€” Site Context 1
Photo 8 β€” Site Context 2
Photo 9 β€” Site Context 3
Photo 10 β€” Site Context 4
Photo 11 β€” Site Context 5
Photo 12 β€” Site Context 6
Photo 13 β€” Site Context 7
Photo 14 β€” Site Context 8
Photo 15 β€” Site Context 9
Photo 16 β€” Site Context 10
Photo 17 β€” Site Context 11
Photo 18 β€” Site Context 12
Photo 19 β€” Site Context 13
Photo 20 β€” Site Context 14
Photo 21 β€” Site Context 15
Photo 22 β€” Site Context 16
Photo 23 β€” Site Context 17

Download / Print PDFEdit Before Printing