Banglalink Alliance Computers Limited

Site HOTO Report β€” DHK_X0213

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 25-Oct-2026 20:30 BD time
45%Form Completion 0/0Checklist OK 0Open Snags 0Total Snags 0Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo, Fuel Gauge Photo.

Site & Handover Details

Site CodeDHK_X0213ZoneSylhet
HOTO Date2026-08-17DistrictNarsingdi
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonMd HossainTakeover PersonMosharof
Handover Phone01715163812Takeover Phone01781409484
Inspected ByMosharofSecurity Guard—
Access Key Handed Over—Site TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name—

Generator Information

DG BrandTempestGenset Asset No.—
Capacity (KVA)30Type—
Fuel Tank Capacity2000Present RH85506
Fuel (no water)179 LFuel (total)253 L
Water Amount74 LFuel Amount (word)—
DG Site TypeStandardDG Locked After Fueling—
DG Present StatusOK Genset ON AlarmOK
Battery BrandHamkoBattery Serial—
Battery AH100Engine Serial—
ATS Brand—ATS ModeAuto
RH Meter Type—Last Service Date2026-08-17
Key Type—Key Status β€” BTS—
Key Status β€” DG Room—
Active DG—Connected Fuel Tanks—
Faulty/Disconnected DG—Faulty/Disconnected Tanks—

Snags Found (0)

No snags logged for this visit.

Deficiencies & Safety Remarks

DG Major Deficiencies—
Safety Remarks—
General RemarksDigitized from scanned paper HOTO checklist (Narsingdi zone backfill). | PDF checklist notes: hoto_date not clearly written on this form (no date/site-ID header note at top like other forms in this batch); site address handwritten as 'Pachdona'. Top-right fuel note: Total fuel=253L, Water=74L, Actual fuel=178L - meaningfully different from the '253L' entered in the main Available Fuel field; the 178L 'actual fuel' (net of water contamination) is worth flagging since water content (74L) is unusually high relative to total. 'No of active DG / connected fuel tanks / faulty disconnected DG / faulty disconnected tanks' rows were left blank (not filled in), unlike other forms in this batch. Checklist for Disconnected generator and spare parts table is empty (no snags recorded). All connected-generator checklist items marked OK, no NOK ticks. Handover Status: Completed checked.

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter
No Photo
Not Filled Fuel Gauge
Md Hossain
Handed Over By · Dhaly Infratech
01715163812
Date:  
Mosharof
Taken Over By · Alliance Computers Limited
01781409484
Date:  
 
BL Concern · Name / Signature
 
Date:  

Download / Print PDFEdit Before Printing