| 73%Form Completion | 15/15Checklist OK | 5Open Snags | 5Total Snags | 23Photos Attached |
| Site Code | SYL_X0364 | Zone | Sylhet |
|---|---|---|---|
| HOTO Date | 2026-09-03 | District | Moulavibazar |
| Handover Org | Dhaly Infratech | Takeover Org | Alliance Computers Limited |
| Handover Person | Omar Faruk | Takeover Person | Sourav |
| Handover Phone | 01406394566 | Takeover Phone | 01847426870 |
| Inspected By | sourov sarkar | Security Guard | Yes |
| Access Key Handed Over | — | Site Type | Not Filled |
| BTS Type | Not Filled | ||
| Shared with Operator | Not Filled | Shared Operator Name | — |
| DG Brand | FG Wilson | Genset Asset No. | No |
|---|---|---|---|
| Capacity (KVA) | 30 | Type | Can |
| Fuel Tank Capacity | 2000 | Present RH | 146.4 |
| Fuel (no water) | 394 L | Fuel (total) | 394 L |
| Water Amount | 00 L | Fuel Amount (word) | Three Hundred Ninety Four Liters |
| DG Site Type | Standard | DG Locked After Fueling | Yes |
| DG Present Status | OK | Genset ON Alarm | OK |
| Battery Brand | Volvo | Battery Serial | 05BB0325 |
| Battery AH | 100 | Engine Serial | DJ32015 |
| ATS Brand | Local | ATS Mode | Auto |
| RH Meter Type | Digital from controller | Last Service Date | 2026-07-28 |
| Key Type | Local Key | Key Status β BTS | Local |
| Key Status β DG Room | Local | ||
| Active DG | 1 | Connected Fuel Tanks | 1 |
| Faulty/Disconnected DG | 0 | Faulty/Disconnected Tanks | 0 |
| Item | Value | Item | Value |
|---|---|---|---|
| Earth Connection OK | Yes | Load Current (A) | 23 |
| Frequency (Hz) | 50.3 | Phase | 3 Phase |
| Output | 23 | Voltage L1-L2 | 390 |
| Voltage L2-L3 | 395 | Voltage L3-L1 | 389 |
| Voltage L1-N | 210 | Voltage L2-N | 205 |
| Voltage L3-N | 212 | Current Line 1 | 8 |
| Current Line 2 | 7 | Current Line 3 | 8 |
| Engine Brand | Perkins | Controller Status | OK |
| Black Smoke Status | OK | DG Battery Charger | OK |
| ATS Physical & Functional Status | OK | DG Automation (VDTC/RVDTC/Rectifier) per BL Standard | OK |
| Fuel Preserved at Safe & Appropriate Location | OK | Exhaust Fan / Ventilation Sufficient When Running | OK |
| Sufficient Water in Radiator & Battery | OK | DG Radiator Condition | OK |
| DG Battery Condition | OK | DG Runs in Both Auto & Manual Mode | OK |
| GENSET ON Alarm Functioning Properly | OK | Lub Oil Status (Level & Colour) | OK |
| DG RH Meter Working Properly | OK | No Parts Missing (if missing, note in snags below) | OK |
| Snag # | System | Category | Component | Status | Observations | Action | Photo |
|---|---|---|---|---|---|---|---|
| S-162 | General | — | DG Fuel Pipe | Faulty | Fuel pipe hard (from paper HOTO checklist PDF, transcribed 2026-09-16) | Open | — |
| S-163 | General | — | Hi-Temp Sensor | Faulty | Hi-temp sensor faulty (preceding phrase 'need to fuel tank' crossed out/cancelled) (from paper HOTO checklist PDF, transcribed 2026-09-16) | Open | — |
| S-164 | General | — | DG Controller | Faulty | Not fixed, needs to be fixed properly (from paper HOTO checklist PDF, transcribed 2026-09-16) | Open | — |
| S-165 | General | — | DG Room Light | Not Available | Written as faulty then struck through/cancelled -- likely resolved or entered in error, treat with caution (from paper HOTO checklist PDF, transcribed 2026-09-16) | Open | — |
| S-166 | General | — | Phase (electrical) | Faulty | 1 phase missing (from paper HOTO checklist PDF, transcribed 2026-09-16) | Open | — |
| DG Major Deficiencies | DG fuel pipe hard; Hi-temp sensor faulty (a crossed-out 'need to fuel tank' note preceded it); DG controller not fixed, needs to be fixed properly; DG room light faulty (struck through/cancelled); 1 phase missing | ||
|---|---|---|---|
| Safety Remarks | DG fuel pipe hard; Hi-temp sensor faulty; DG controller not fixed, needs to be fixed properly; 1 phase missing | ||
| General Remarks | PDF checklist notes: Genset Asset No field literally handwritten as 'NO' (may mean 'none/not assigned' rather than a value). Engine serial handwriting dense and partly overlapped, transcription is best-effort -- verify against original. Below the main signature block, two additional numbered notes ((iii)/(iv) style) appear outside the boxed form area: 'DG room light faulty' (struck through) and '1 phase missing' -- included as snags but flagged since one is cancelled by the writer. Site already has a real DB record per task context; this is a supplemental/cross-check extraction. | ||
![]() Site / Nameplate |
![]() DG RH / Meter |
![]() Fuel Gauge |
|||||||||||||||||
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
|
Omar Faruk
Handed Over By · Dhaly Infratech
01406394566
Date:
|
Sourav
Taken Over By · Alliance Computers Limited
01847426870
Date:
|
BL Concern · Name / Signature
Date:
|
Photo 1 β Site / Nameplate
|
Photo 2 β DG RH / Meter
|
Photo 3 β Fuel Gauge
|
Photo 4 β Additional Photos 1
|
Photo 5 β Additional Photos 2
|
Photo 6 β Additional Photos 3
|
Photo 7 β Additional Photos 4
|
Photo 8 β Additional Photos 5
|
Photo 9 β Additional Photos 6
|
Photo 10 β Additional Photos 7
|
Photo 11 β Additional Photos 8
|
Photo 12 β Additional Photos 9
|
Photo 13 β Additional Photos 10
|
Photo 14 β Additional Photos 11
|
Photo 15 β Additional Photos 12
|
Photo 16 β Additional Photos 13
|
Photo 17 β Additional Photos 14
|
Photo 18 β Additional Photos 15
|
Photo 19 β Additional Photos 16
|
Photo 20 β Additional Photos 17
|
Photo 21 β Additional Photos 18
|
Photo 22 β Additional Photos 19
|
Photo 23 β Additional Photos 20
|