Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0550

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 25-Oct-2026 18:09 BD time
36%Form Completion 0/0Checklist OK 1Open Snags 1Total Snags 0Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Inspected By, Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo, Fuel Gauge Photo.

Site & Handover Details

Site CodeSYL_X0550ZoneSylhet
HOTO Date2026-09-10DistrictMoulavibazar
Handover Org—Takeover Org—
Handover PersonMd. Abu SayedTakeover PersonMd. Helal Uddin
Handover Phone01716332171Takeover Phone—
Inspected ByNot FilledSecurity Guard—
Access Key Handed Over—Site TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name—

Generator Information

DG BrandMutsangryGenset Asset No.—
Capacity (KVA)22Type—
Fuel Tank Capacity2000Present RH2090
Fuel (no water)— LFuel (total)— L
Water Amount— LFuel Amount (word)—
DG Site Type—DG Locked After Fueling—
DG Present StatusOK Genset ON AlarmOK
Battery BrandHomkoBattery SerialVIMP8188040059
Battery AH100Engine SerialNS44L2216N6333
ATS Brand—ATS ModeAuto
RH Meter Type—Last Service Date—
Key Type—Key Status β€” BTS—
Key Status β€” DG Room—
Active DG1Connected Fuel Tanks1
Faulty/Disconnected DG0Faulty/Disconnected Tanks0

Snags Found (1)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-167 General — DG Fuel Pipe Faulty Fuel pipe hard, needs to be changed (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —

Deficiencies & Safety Remarks

DG Major DeficienciesDG fuel pipe hard, needs to change
Safety RemarksDG fuel pipe hard, needs to change
General RemarksPlaceholder visit auto-created on 2026-09-16 from a recovered paper HOTO checklist PDF found in the Telegram Documents export (site not previously detected in the chat-photo migration). | PDF checklist notes: SITE ID VERIFICATION: the handwritten Site ID at the top of this form reads clearly and unambiguously as 'SYL-X0550' (capital letters, well-formed digits, no ambiguity) -- confirms the prior pass's reading. A separate date '10-9-2026' is handwritten in the top-right corner of the page (outside/above the main form table), which we've used as hoto_date, but note the 'Date of Handover' field inside the signature block at the bottom was left BLANK, and neither 'Completed' nor 'Not Completed' checkbox was ticked -- so handover completion status is unconfirmed from this form despite the top-corner date suggesting the visit did occur on 2026-09-10. Gen Brand handwriting is unusual/hard to read, transcribed literally as 'Mutsangry' (possibly a brand name not recognized, e.g. could be 'Multsangry' or similar -- low confidence on this specific field only). 'Available Fuel Amount' recorded as 4162 which seems abnormally high versus a 2000L tank capacity -- likely a transcription/handwriting artifact (could be '416' with an extra stray mark), flagging for human review rather than guessing. This is a NEWLY discovered site per task context (not previously matched from a generic filename) -- all fields here are new, none should be treated as already in DB.

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter
No Photo
Not Filled Fuel Gauge
Md. Abu Sayed
Handed Over By · —
01716332171
Date:  
Md. Helal Uddin
Taken Over By · —
—
Date:  
 
BL Concern · Name / Signature
 
Date:  

Download / Print PDFEdit Before Printing