| 100%Form Completion | 14/15Checklist OK | 2Open Snags | 2Total Snags | 41Photos Attached |
| Site Code | SYL_X0274 | Zone | Sylhet |
|---|---|---|---|
| HOTO Date | 2026-09-07 | District | Sunamganj |
| Handover Org | Dhaly Infratech | Takeover Org | Alliance Computers Limited |
| Handover Person | Md. Anwar | Takeover Person | Ismail Hossain |
| Handover Phone | 01737-713807 | Takeover Phone | 01847426858 |
| Inspected By | Ismail Siraji | Security Guard | No |
| Access Key Handed Over | Yes | Site Type | GFT |
| BTS Type | Indoor | ||
| Shared with Operator | No | Shared Operator Name | N/A |
| DG Brand | Welland Power | Genset Asset No. | 2001001IB5K |
|---|---|---|---|
| Capacity (KVA) | 20 | Type | Can |
| Fuel Tank Capacity | 2000 | Present RH | 966.50 |
| Fuel (no water) | 127 L | Fuel (total) | 164 L |
| Water Amount | 37 L | Fuel Amount (word) | One Hundred Sixty Four Liters |
| DG Site Type | Standard | DG Locked After Fueling | Yes |
| DG Present Status | OK | Genset ON Alarm | OK |
| Battery Brand | Lucas | Battery Serial | 3F27GF12645425 |
| Battery AH | 100 | Engine Serial | GV51790U |
| ATS Brand | Local | ATS Mode | Auto |
| RH Meter Type | Digital from controller | Last Service Date | — |
| Key Type | Local Key | Key Status β BTS | Local |
| Key Status β DG Room | Local | ||
| Active DG | 1 | Connected Fuel Tanks | 1 |
| Faulty/Disconnected DG | 0 | Faulty/Disconnected Tanks | 0 |
| Item | Value | Item | Value |
|---|---|---|---|
| Earth Connection OK | Yes | Load Current (A) | 40 |
| Frequency (Hz) | 50.9 | Phase | 3 Phase |
| Output | 400 | Engine Brand | Perkins |
| Voltage L1-L2 | 401 | Voltage L2-L3 | 402 |
| Voltage L3-L1 | 402 | Voltage L1-N | 231 |
| Voltage L2-N | 231 | Voltage L3-N | 230 |
| Current Line 1 | 16 | Current Line 2 | 16 |
| Current Line 3 | 8 | N-G | 3.36 |
| Controller Status | OK | Black Smoke Status | OK |
| DG Battery Charger | OK | ATS Physical & Functional Status | OK |
| DG Automation (VDTC/RVDTC/Rectifier) per BL Standard | OK | Fuel Preserved at Safe & Appropriate Location | OK |
| Exhaust Fan / Ventilation Sufficient When Running | OK | Sufficient Water in Radiator & Battery | OK |
| DG Radiator Condition | NOK | DG Battery Condition | OK |
| DG Runs in Both Auto & Manual Mode | OK | GENSET ON Alarm Functioning Properly | OK |
| Lub Oil Status (Level & Colour) | OK | DG RH Meter Working Properly | OK |
| No Parts Missing (if missing, note in snags below) | OK |
| Snag # | System | Category | Component | Status | Observations | Action | Photo |
|---|---|---|---|---|---|---|---|
| S-073 | DG | DG - Other | The radiator is full of dust | Faulty | — | Open | ![]() |
| S-074 | DG | DG - Other | No water in site radiator | Faulty | — | Open | ![]() |
| DG Major Deficiencies | Radiator not clean, needs servicing | ||
|---|---|---|---|
| Safety Remarks | Radiator not clean, needs servicing | ||
| General Remarks | PDF checklist notes: Engine serial last character ambiguous (read as 'GV517904', could be 'GV51790U'). 'Available Fuel Amount (Present Stock)' field left blank on form. Handing-over vendor participant's name not legibly written, only phone number '01734713807' visible. Stacked digit column for no_active_dg/no_connected_fuel_tanks/no_faulty_disconnected_dg/no_faulty_disconnected_tanks was hard to align exactly with rows (appears as '1','0','0' spanning 4 label rows) - values given are best-effort, verify against original if precision matters. Handover status Completed, checked. Site already has a real DB record per task context; this is a supplemental/cross-check extraction. | ||
![]() Site / Nameplate |
![]() DG RH / Meter |
![]() Fuel Gauge |
|||||||||||||||||||||||||||||||||
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
|
Md. Anwar
Handed Over By · Dhaly Infratech
01737-713807
Date:
|
Ismail Hossain
Taken Over By · Alliance Computers Limited
01847426858
Date:
|
BL Concern · Name / Signature
Date:
|
Photo 1 β Site / Nameplate
|
Photo 2 β DG RH / Meter
|
Photo 3 β Fuel Gauge
|
Photo 4 β S-073 β The radiator is full of dust
|
Photo 5 β S-074 β No water in site radiator
|
Photo 6 β Additional Photos 1
|
Photo 7 β Additional Photos 2
|
Photo 8 β Additional Photos 3
|
Photo 9 β Additional Photos 4
|
Photo 10 β Additional Photos 5
|
Photo 11 β Additional Photos 6
|
Photo 12 β Additional Photos 7
|
Photo 13 β Additional Photos 8
|
Photo 14 β Additional Photos 9
|
Photo 15 β Additional Photos 10
|
Photo 16 β Additional Photos 11
|
Photo 17 β Additional Photos 12
|
Photo 18 β Additional Photos 13
|
Photo 19 β Additional Photos 14
|
Photo 20 β Additional Photos 15
|
Photo 21 β Additional Photos 16
|
Photo 22 β Additional Photos 17
|
Photo 23 β Additional Photos 18
|
Photo 24 β Additional Photos 19
|
Photo 25 β Additional Photos 20
|
Photo 26 β Additional Photos 21
|
Photo 27 β Additional Photos 22
|
Photo 28 β Additional Photos 23
|
Photo 29 β Additional Photos 24
|
Photo 30 β Additional Photos 25
|
Photo 31 β Additional Photos 26
|
Photo 32 β Additional Photos 27
|
Photo 33 β Additional Photos 28
|
Photo 34 β Additional Photos 29
|
Photo 35 β Additional Photos 30
|
Photo 36 β Additional Photos 31
|
Photo 37 β Additional Photos 32
|
Photo 38 β Additional Photos 33
|
Photo 39 β Additional Photos 34
|
Photo 40 β Additional Photos 35
|
Photo 41 β Additional Photos 36
|