Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0247

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 07-Sep-2026 19:48 BD time
100%Form Completion 15/15Checklist OK 2Open Snags 2Total Snags 5Photos Attached

Site & Handover Details

Site CodeSYL_X0247ZoneSylhet
HOTO Date2026-09-02DistrictSunamganj
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonMd. Edris Ali.Takeover PersonMd. Ismail Hossain.
Handover Phone01750537433Takeover Phone01847426858
Inspected ByIsmail SirajiSecurity GuardNo
Access Key Handed OverYesSite TypeGFT
BTS TypeIndoor
Shared with OperatorYesShared Operator NameGrameen Phone

Generator Information

DG BrandGreen PowerGenset Asset No.N/A
Capacity (KVA)22TypeCan
Fuel Tank Capacity2000Present RH2350.4
Fuel (no water)352 LFuel (total)352 L
Water Amount— LFuel Amount (word)Three Hundred Fifty Two Liters
DG Site TypeStandardDG Locked After FuelingYes
DG Present StatusOK Genset ON AlarmOK
Battery BrandHamkoBattery SerialVIMP8188040007
Battery AH100Engine SerialSK66045U505120
ATS BrandLocalATS ModeAuto
RH Meter TypeDigital from controllerLast Service Date2026-03-31
Key TypeLocal KeyKey Status β€” BTSLocal
Key Status β€” DG RoomLocal
Active DG1Connected Fuel Tanks1
Faulty/Disconnected DGFaulty/Disconnected Tanks

Connected Generator Checklist & Readings

ItemValueItemValue
Earth Connection OKYesLoad Current (A)35
Frequency (Hz)50.5Phase3 Phase
Output406Engine BrandPerkings
Voltage L1-L2406Voltage L2-L3405
Voltage L3-L1406Voltage L1-N233
Voltage L2-N234Voltage L3-N233
Current Line 114Current Line 214
Current Line 37N-G0.045
Controller StatusOKBlack Smoke StatusOK
DG Battery ChargerOKATS Physical & Functional StatusOK
DG Automation (VDTC/RVDTC/Rectifier) per BL StandardOKFuel Preserved at Safe & Appropriate LocationOK
Exhaust Fan / Ventilation Sufficient When RunningOKSufficient Water in Radiator & BatteryOK
DG Radiator ConditionOKDG Battery ConditionOK
DG Runs in Both Auto & Manual ModeOKGENSET ON Alarm Functioning ProperlyOK
Lub Oil Status (Level & Colour)OKDG RH Meter Working ProperlyOK
No Parts Missing (if missing, note in snags below)OK

Snags Found (2)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-015 DG DG - Other DG canopy broken Faulty Open
S-016 DG DG - Controller/Electronics DG controller install proper way Faulty Open

Deficiencies & Safety Remarks

DG Major DeficienciesDG canopy broken.
Safety RemarksDG controller install not proper way .
General Remarks

Site Photos


Site / Nameplate

DG RH / Meter

Fuel Gauge
Md. Edris Ali.
Handed Over By · Dhaly Infratech
01750537433
Date:  
Md. Ismail Hossain.
Taken Over By · Alliance Computers Limited
01847426858
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (5)

Full-size reference photos for SYL_X0247, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (3)

Photo 1 β€” Site / Nameplate
Photo 2 β€” DG RH / Meter
Photo 3 β€” Fuel Gauge

Snag Evidence Photos (2)

Photo 4 β€” S-015 β€” DG canopy broken
Photo 5 β€” S-016 β€” DG controller install proper way

Download / Print PDFEdit Before Printing