Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0219

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 09-Sep-2026 15:20 BD time
18%Form Completion 0/0Checklist OK 0Open Snags 0Total Snags 40Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Handover Person, Takeover Person, DG Present Status, Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo, Fuel Gauge Photo.

Site & Handover Details

Site CodeSYL_X0219ZoneSylhet
HOTO Date2026-09-06DistrictSylhet
Handover OrgTakeover Org
Handover PersonNot FilledTakeover PersonNot Filled
Handover PhoneTakeover Phone
Inspected ByAli BaharSecurity Guard
Access Key Handed OverSite TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name

Generator Information

DG BrandGenset Asset No.
Capacity (KVA)Type
Fuel Tank CapacityPresent RH
Fuel (no water)— LFuel (total)— L
Water Amount— LFuel Amount (word)
DG Site TypeDG Locked After Fueling
DG Present StatusNot Filled Genset ON Alarm
Battery BrandBattery Serial
Battery AHEngine Serial
ATS BrandATS Mode
RH Meter TypeLast Service Date
Key TypeKey Status β€” BTS
Key Status β€” DG Room
Active DGConnected Fuel Tanks
Faulty/Disconnected DGFaulty/Disconnected Tanks

Snags Found (0)

No snags logged for this visit.

Deficiencies & Safety Remarks

DG Major Deficiencies
Safety Remarks
General RemarksPlaceholder visit auto-created from HOTO Telegram group photos on 2026-09-09. Technical fields (DG readings, checklist, snags) still need to be filled in via the app.

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter
No Photo
Not Filled Fuel Gauge

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional
Handed Over By · —
Date:  
Taken Over By · —
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (40)

Full-size reference photos for SYL_X0219, grouped by type and numbered for cross-reference against the tables above.

Additional Photos (40)

Photo 1 β€” Additional Photos 1
Photo 2 β€” Additional Photos 2
Photo 3 β€” Additional Photos 3
Photo 4 β€” Additional Photos 4
Photo 5 β€” Additional Photos 5
Photo 6 β€” Additional Photos 6
Photo 7 β€” Additional Photos 7
Photo 8 β€” Additional Photos 8
Photo 9 β€” Additional Photos 9
Photo 10 β€” Additional Photos 10
Photo 11 β€” Additional Photos 11
Photo 12 β€” Additional Photos 12
Photo 13 β€” Additional Photos 13
Photo 14 β€” Additional Photos 14
Photo 15 β€” Additional Photos 15
Photo 16 β€” Additional Photos 16
Photo 17 β€” Additional Photos 17
Photo 18 β€” Additional Photos 18
Photo 19 β€” Additional Photos 19
Photo 20 β€” Additional Photos 20
Photo 21 β€” Additional Photos 21
Photo 22 β€” Additional Photos 22
Photo 23 β€” Additional Photos 23
Photo 24 β€” Additional Photos 24
Photo 25 β€” Additional Photos 25
Photo 26 β€” Additional Photos 26
Photo 27 β€” Additional Photos 27
Photo 28 β€” Additional Photos 28
Photo 29 β€” Additional Photos 29
Photo 30 β€” Additional Photos 30
Photo 31 β€” Additional Photos 31
Photo 32 β€” Additional Photos 32
Photo 33 β€” Additional Photos 33
Photo 34 β€” Additional Photos 34
Photo 35 β€” Additional Photos 35
Photo 36 β€” Additional Photos 36
Photo 37 β€” Additional Photos 37
Photo 38 β€” Additional Photos 38
Photo 39 β€” Additional Photos 39
Photo 40 β€” Additional Photos 40

Download / Print PDFEdit Before Printing