| 73%Form Completion | 0/0Checklist OK | 3Open Snags | 3Total Snags | 46Photos Attached |
| Site Code | SYL_X0097 | Zone | Sylhet |
|---|---|---|---|
| HOTO Date | 2026-09-07 | District | Moulavibazar |
| Handover Org | Dhaly Infratech | Takeover Org | Alliance Computers Limited |
| Handover Person | Abu sayed | Takeover Person | Sourav |
| Handover Phone | 01716332171 | Takeover Phone | 01847426870 |
| Inspected By | sourov sarkar | Security Guard | — |
| Access Key Handed Over | — | Site Type | Not Filled |
| BTS Type | Not Filled | ||
| Shared with Operator | Not Filled | Shared Operator Name | — |
| DG Brand | FG Wilson | Genset Asset No. | — |
|---|---|---|---|
| Capacity (KVA) | 22 | Type | — |
| Fuel Tank Capacity | 65 | Present RH | 64.2 |
| Fuel (no water) | 63 L | Fuel (total) | 63 L |
| Water Amount | — L | Fuel Amount (word) | Sixty Three Liters |
| DG Site Type | Standard | DG Locked After Fueling | — |
| DG Present Status | OK | Genset ON Alarm | OK |
| Battery Brand | Hamko | Battery Serial | PO33WH0H0050 |
| Battery AH | 100 | Engine Serial | N844L2216M524 |
| ATS Brand | Local | ATS Mode | Auto |
| RH Meter Type | — | Last Service Date | — |
| Key Type | — | Key Status โ BTS | — |
| Key Status โ DG Room | — | ||
| Active DG | 1 | Connected Fuel Tanks | 1 (Base ta |
| Faulty/Disconnected DG | 0 | Faulty/Disconnected Tanks | 0 |
| Item | Value | Item | Value |
|---|---|---|---|
| Earth Connection OK | Yes | Load Current (A) | 22 |
| Frequency (Hz) | 50.2 | Phase | 3 Phase |
| Snag # | System | Category | Component | Status | Observations | Action | Photo |
|---|---|---|---|---|---|---|---|
| S-067 | DG | DG - Other | DG room dusty | Faulty | — | Open | ![]() |
| S-068 | DG | DG - Other | DG Room Light (เฆกเฆฟเฆเฆฟ เฆฐเงเฆฎเงเฆฐ เฆฒเฆพเฆเฆ) | Faulty | — | Open | — |
| S-069 | DG | Structural/Civil Damage | DG room roof tin faulty | Faulty | — | Open | ![]() |
| DG Major Deficiencies | 1) DG room dusty, needs brush clean 2) DG room roof tin faulty | ||
|---|---|---|---|
| Safety Remarks | — | ||
| General Remarks | PDF checklist notes: Working/Faulty checkbox for 'Generator status during handover' appears left blank in this crop (unlike most other sites in this batch). DG last servicing date noted as 12-5-27 (year appears to read '27' rather than '26' - possibly a future/typo date on the original form, worth verifying). DG automation by VDTC/RVDTC/Rectifier checklist row is NOK - only fault among the standard OK/NOK checklist items besides the free-text remarks. | ||
![]() Site / Nameplate |
![]() DG RH / Meter |
![]() Fuel Gauge |
||||||||||||||||||||||||||||||||||||||
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
![]() Additional |
|
Abu sayed
Handed Over By · Dhaly Infratech
01716332171
Date:
|
Sourav
Taken Over By · Alliance Computers Limited
01847426870
Date:
|
BL Concern · Name / Signature
Date:
|
Photo 1 โ Site / Nameplate
|
Photo 2 โ DG RH / Meter
|
Photo 3 โ Fuel Gauge
|
Photo 4 โ S-067 โ DG room dusty
|
Photo 5 โ S-069 โ DG room roof tin faulty
|
Photo 6 โ Additional Photos 1
|
Photo 7 โ Additional Photos 2
|
Photo 8 โ Additional Photos 3
|
Photo 9 โ Additional Photos 4
|
Photo 10 โ Additional Photos 5
|
Photo 11 โ Additional Photos 6
|
Photo 12 โ Additional Photos 7
|
Photo 13 โ Additional Photos 8
|
Photo 14 โ Additional Photos 9
|
Photo 15 โ Additional Photos 10
|
Photo 16 โ Additional Photos 11
|
Photo 17 โ Additional Photos 12
|
Photo 18 โ Additional Photos 13
|
Photo 19 โ Additional Photos 14
|
Photo 20 โ Additional Photos 15
|
Photo 21 โ Additional Photos 16
|
Photo 22 โ Additional Photos 17
|
Photo 23 โ Additional Photos 18
|
Photo 24 โ Additional Photos 19
|
Photo 25 โ Additional Photos 20
|
Photo 26 โ Additional Photos 21
|
Photo 27 โ Additional Photos 22
|
Photo 28 โ Additional Photos 23
|
Photo 29 โ Additional Photos 24
|
Photo 30 โ Additional Photos 25
|
Photo 31 โ Additional Photos 26
|
Photo 32 โ Additional Photos 27
|
Photo 33 โ Additional Photos 28
|
Photo 34 โ Additional Photos 29
|
Photo 35 โ Additional Photos 30
|
Photo 36 โ Additional Photos 31
|
Photo 37 โ Additional Photos 32
|
Photo 38 โ Additional Photos 33
|
Photo 39 โ Additional Photos 34
|
Photo 40 โ Additional Photos 35
|
Photo 41 โ Additional Photos 36
|
Photo 42 โ Additional Photos 37
|
Photo 43 โ Additional Photos 38
|
Photo 44 โ Additional Photos 39
|
Photo 45 โ Additional Photos 40
|
Photo 46 โ Additional Photos 41
|