Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 25-Oct-2026 20:30 BD time
73%Form Completion 15/15Checklist OK 2Open Snags 2Total Snags 25Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing.

Site & Handover Details

Site CodeSYL_X0092ZoneSylhet
HOTO Date2026-09-07DistrictMoulavibazar
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonAbu sayedTakeover PersonSourav
Handover Phone01716332171Takeover Phone01847426870
Inspected Bysourov sarkarSecurity GuardYes
Access Key Handed Over—Site TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name—

Generator Information

DG BrandFG WilsonGenset Asset No.—
Capacity (KVA)30Type—
Fuel Tank Capacity2000Present RH90.3
Fuel (no water)315 LFuel (total)315 L
Water Amount— LFuel Amount (word)Three Hundred Fifteen Liters
DG Site Type—DG Locked After FuelingYes
DG Present StatusOK Genset ON AlarmOK
Battery BrandVolvoBattery Serial—
Battery AH100Engine Serial—
ATS BrandLocalATS ModeAuto
RH Meter TypeDigital from controllerLast Service Date—
Key TypeLocal KeyKey Status β€” BTS—
Key Status β€” DG Room—
Active DG1Connected Fuel Tanks1
Faulty/Disconnected DG—Faulty/Disconnected Tanks—

Connected Generator Checklist & Readings

ItemValueItemValue
Earth Connection OKYesLoad Current (A)24
Phase3 PhaseVoltage L1-L2387
Voltage L2-L3383Voltage L3-L1390
Voltage L1-N210Voltage L2-N205
Voltage L3-N210Current Line 18
Current Line 28Current Line 38
Engine BrandPerkins Controller StatusOK
Black Smoke StatusOKDG Battery ChargerOK
ATS Physical & Functional StatusOKDG Automation (VDTC/RVDTC/Rectifier) per BL StandardOK
Fuel Preserved at Safe & Appropriate LocationOKExhaust Fan / Ventilation Sufficient When RunningOK
Sufficient Water in Radiator & BatteryOKDG Radiator ConditionOK
DG Battery ConditionOKDG Runs in Both Auto & Manual ModeOK
GENSET ON Alarm Functioning ProperlyOKLub Oil Status (Level & Colour)OK
DG RH Meter Working ProperlyOKNo Parts Missing (if missing, note in snags below)OK

Snags Found (2)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-065 DG DG - Other Fuel Pipe (ফুয়েল ΰ¦ͺাইΰ¦ͺ) Faulty — Open —
S-066 DG DG - Other DG CB Problematic Faulty — Open —

Deficiencies & Safety Remarks

DG Major Deficiencies—
Safety Remarks—
General Remarks—

Site Photos


Site / Nameplate

DG RH / Meter

Fuel Gauge

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional
Abu sayed
Handed Over By · Dhaly Infratech
01716332171
Date:  
Sourav
Taken Over By · Alliance Computers Limited
01847426870
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (25)

Full-size reference photos for SYL_X0092, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (3)

Photo 1 β€” Site / Nameplate
Photo 2 β€” DG RH / Meter
Photo 3 β€” Fuel Gauge

Additional Photos (22)

Photo 4 β€” Additional Photos 1
Photo 5 β€” Additional Photos 2
Photo 6 β€” Additional Photos 3
Photo 7 β€” Additional Photos 4
Photo 8 β€” Additional Photos 5
Photo 9 β€” Additional Photos 6
Photo 10 β€” Additional Photos 7
Photo 11 β€” Additional Photos 8
Photo 12 β€” Additional Photos 9
Photo 13 β€” Additional Photos 10
Photo 14 β€” Additional Photos 11
Photo 15 β€” Additional Photos 12
Photo 16 β€” Additional Photos 13
Photo 17 β€” Additional Photos 14
Photo 18 β€” Additional Photos 15
Photo 19 β€” Additional Photos 16
Photo 20 β€” Additional Photos 17
Photo 21 β€” Additional Photos 18
Photo 22 β€” Additional Photos 19
Photo 23 β€” Additional Photos 20
Photo 24 β€” Additional Photos 21
Photo 25 β€” Additional Photos 22

Download / Print PDFEdit Before Printing