Banglalink Alliance Computers Limited

Site HOTO Report β€” SYL_X0073

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 25-Oct-2026 20:26 BD time
73%Form Completion 13/15Checklist OK 9Open Snags 9Total Snags 30Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing.

Site & Handover Details

Site CodeSYL_X0073ZoneSylhet
HOTO Date2026-08-30DistrictSylhet
Handover OrgDhali Infratech LtdTakeover OrgAlliance Computers Limited
Handover PersonMd.Bulbul AhomedTakeover PersonMd. Ismail Hossain
Handover Phone01406394565Takeover Phone01847426858
Inspected ByIsmail SirajiSecurity GuardYes
Access Key Handed OverYesSite TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name—

Generator Information

DG BrandFg wilsonGenset Asset No.000
Capacity (KVA)22TypeCan
Fuel Tank Capacity2000Present RH42.2
Fuel (no water)14 LFuel (total)14 L
Water Amount00 LFuel Amount (word)Fourtin
DG Site TypeStandardDG Locked After Fueling—
DG Present StatusNOK Genset ON AlarmOK
Battery BrandHamko 100AhBattery SerialP8199420039
Battery AH100Engine Serial35212u9527765
ATS BrandLocalATS ModeAuto
RH Meter TypeDigital from controllerLast Service Date—
Key Type—Key Status β€” BTSLocal
Key Status β€” DG RoomLocal
Active DG1Connected Fuel Tanks00
Faulty/Disconnected DG00Faulty/Disconnected Tanks1

Connected Generator Checklist & Readings

ItemValueItemValue
Controller StatusOKBlack Smoke StatusOK
DG Battery ChargerOKATS Physical & Functional StatusOK
DG Automation (VDTC/RVDTC/Rectifier) per BL StandardOKFuel Preserved at Safe & Appropriate LocationNOK
Exhaust Fan / Ventilation Sufficient When RunningOKSufficient Water in Radiator & BatteryOK
DG Radiator ConditionOKDG Battery ConditionNOK
DG Runs in Both Auto & Manual ModeOKGENSET ON Alarm Functioning ProperlyOK
Lub Oil Status (Level & Colour)OKDG RH Meter Working ProperlyOK
No Parts Missing (if missing, note in snags below)OK

Snags Found (9)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-142 General — DG Battery Faulty DG battery faulty (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-143 General — DG Battery Cable Faulty Aluminium cable needs to be changed (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-144 General — Hose pipe Faulty Leakage (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-145 General — Hi-temp sensor Faulty Broken (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-146 General — DG Dynamo Faulty Faulty (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-147 General — Silencer pipe Faulty Leakage (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-148 General — DG room gate Faulty Broken (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-149 General — DG canopy lock Faulty Faulty (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —
S-150 General — Electrical phase Not Available 1 phase missing (from paper HOTO checklist PDF, transcribed 2026-09-16) Open —

Deficiencies & Safety Remarks

DG Major Deficiencies1.DG Battery faulty. 2.DG Battery cable aluminium need to change. 3.Hose pipe leakage. 4.Hi temperature sensor broken. 5.DG Dynamo faulty. 6.Silencer pipe leakage. 7.DG Room gate broken. 8.DG canopy lock faulty 9.1 Phase missing 10.Fuel thief aria need to proper protection. 11.1 pcs Transformer Faulty. 12.Last servicing date not found.
Safety Remarks—
General RemarksPDF checklist notes: Multiple checklist NOKs: preservation of fuel at safe location (NOK - fuel theft-prone area, needs proper protection noted separately), sufficient water in radiator/battery (NOK), DG battery condition (NOK), lub oil status marked OK though. 'Exhaust fan' row annotated 'DG outdoor' (likely explaining no fan needed, not a fault). DG last servicing date: 'not found' (no date on filter). Neither Completed nor Not Completed box in Handover Status row appears checked - left null; given multiple significant faults this warrants human follow-up. Date of Handover field in the table itself was blank but a date '30-8-26' appears handwritten near the signature block, used as hoto_date.

Site Photos


Site / Nameplate

DG RH / Meter

Fuel Gauge

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional
Md.Bulbul Ahomed
Handed Over By · Dhali Infratech Ltd
01406394565
Date:  
Md. Ismail Hossain
Taken Over By · Alliance Computers Limited
01847426858
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (30)

Full-size reference photos for SYL_X0073, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (3)

Photo 1 β€” Site / Nameplate
Photo 2 β€” DG RH / Meter
Photo 3 β€” Fuel Gauge

Additional Photos (27)

Photo 4 β€” Additional Photos 1
Photo 5 β€” Additional Photos 2
Photo 6 β€” Additional Photos 3
Photo 7 β€” Additional Photos 4
Photo 8 β€” Additional Photos 5
Photo 9 β€” Additional Photos 6
Photo 10 β€” Additional Photos 7
Photo 11 β€” Additional Photos 8
Photo 12 β€” Additional Photos 9
Photo 13 β€” Additional Photos 10
Photo 14 β€” Additional Photos 11
Photo 15 β€” Additional Photos 12
Photo 16 β€” Additional Photos 13
Photo 17 β€” Additional Photos 14
Photo 18 β€” Additional Photos 15
Photo 19 β€” Additional Photos 16
Photo 20 β€” Additional Photos 17
Photo 21 β€” Additional Photos 18
Photo 22 β€” Additional Photos 19
Photo 23 β€” Additional Photos 20
Photo 24 β€” Additional Photos 21
Photo 25 β€” Additional Photos 22
Photo 26 β€” Additional Photos 23
Photo 27 β€” Additional Photos 24
Photo 28 β€” Additional Photos 25
Photo 29 β€” Additional Photos 26
Photo 30 β€” Additional Photos 27

Download / Print PDFEdit Before Printing