Banglalink Alliance Computers Limited

Site HOTO Report β€” DHK_X2681

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 07-Sep-2026 19:48 BD time
45%Form Completion 0/0Checklist OK 0Open Snags 0Total Snags 0Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo, Fuel Gauge Photo.

Site & Handover Details

Site CodeDHK_X2681ZoneSylhet
HOTO Date2026-08-31DistrictNarsingdi
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonMd. Kabir HossenTakeover PersonMd. Mahabur Rahman
Handover Phone01958313020Takeover Phone01615220637
Inspected ByMd. Mahabur RahmanSecurity Guard
Access Key Handed OverSite TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name

Generator Information

DG BrandFG WilsonGenset Asset No.
Capacity (KVA)30Type
Fuel Tank Capacity2000Present RH3389
Fuel (no water)419 LFuel (total)419 L
Water Amount— LFuel Amount (word)
DG Site TypeStandardDG Locked After Fueling
DG Present StatusOK Genset ON AlarmOK
Battery BrandBattery Serial
Battery AH100Engine Serial
ATS BrandATS ModeAuto
RH Meter TypeLast Service Date2026-03-31
Key TypeKey Status β€” BTS
Key Status β€” DG Room
Active DGConnected Fuel Tanks
Faulty/Disconnected DGFaulty/Disconnected Tanks

Snags Found (0)

No snags logged for this visit.

Deficiencies & Safety Remarks

DG Major Deficiencies
Safety Remarks
General RemarksDigitized from scanned paper HOTO checklist (Narsingdi zone backfill).

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter
No Photo
Not Filled Fuel Gauge
Md. Kabir Hossen
Handed Over By · Dhaly Infratech
01958313020
Date:  
Md. Mahabur Rahman
Taken Over By · Alliance Computers Limited
01615220637
Date:  
 
BL Concern · Name / Signature
 
Date:  

Download / Print PDFEdit Before Printing