Banglalink Alliance Computers Limited

Site HOTO Report β€” DHK_X2119

Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 09-Sep-2026 19:10 BD time
36%Form Completion 0/0Checklist OK 3Open Snags 3Total Snags 21Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Inspected By, DG Present Status, Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo.

Site & Handover Details

Site CodeDHK_X2119ZoneSylhet
HOTO Date2026-09-06DistrictNarsingdi
Handover OrgTakeover Org
Handover PersonMd. Kabir HossenTakeover PersonMd. Mahabur Rahman
Handover Phone01958313020Takeover Phone01615220637
Inspected ByNot FilledSecurity Guard
Access Key Handed OverSite TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name

Generator Information

DG BrandTempestGenset Asset No.
Capacity (KVA)20Type
Fuel Tank Capacity67Present RH2429
Fuel (no water)— LFuel (total)12.7 L
Water Amount— LFuel Amount (word)
DG Site TypeDG Locked After Fueling
DG Present StatusNot Filled Genset ON Alarm
Battery BrandHamkoBattery SerialPO33WKGH0055
Battery AH100Engine Serial0240920/045
ATS BrandTempestATS ModeAuto
RH Meter TypeManual meterLast Service Date2026-06-28
Key TypeKey Status β€” BTS
Key Status β€” DG Room
Active DGConnected Fuel Tanks
Faulty/Disconnected DGFaulty/Disconnected Tanks

Snags Found (3)

Snag #SystemCategoryComponentStatusObservationsActionPhoto
S-089 General (from HOTO Telegram group photo -- needs review) Faulty Auto-tagged as Snag from imported chat photo; please fill in the actual system/category/observation. Open
S-090 General (from HOTO Telegram group photo -- needs review) Faulty Auto-tagged as Snag from imported chat photo; please fill in the actual system/category/observation. Open
S-091 General (from HOTO Telegram group photo -- needs review) Faulty Auto-tagged as Snag from imported chat photo; please fill in the actual system/category/observation. Open

Deficiencies & Safety Remarks

DG Major DeficienciesRoom Light Fault; Faulty fuel tank (2pc available); 1pc DG canopy open (from paper handover checklist).
Safety Remarks
General RemarksTechnical fields backfilled from paper handover checklist photo (DHK_X2119_EXTRA_010.jpg) on 2026-09-09.

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter

Fuel Gauge

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional

Additional
Md. Kabir Hossen
Handed Over By · —
01958313020
Date:  
Md. Mahabur Rahman
Taken Over By · —
01615220637
Date:  
 
BL Concern · Name / Signature
 
Date:  

Appendix β€” Photo Evidence (21)

Full-size reference photos for DHK_X2119, grouped by type and numbered for cross-reference against the tables above.

Required Site Photos (1)

Photo 1 β€” Fuel Gauge

Snag Evidence Photos (3)

Photo 2 β€” S-089 β€” (from HOTO Telegram group photo -- needs review)
Photo 3 β€” S-090 β€” (from HOTO Telegram group photo -- needs review)
Photo 4 β€” S-091 β€” (from HOTO Telegram group photo -- needs review)

Additional Photos (17)

Photo 5 β€” Additional Photos 1
Photo 6 β€” Additional Photos 2
Photo 7 β€” Additional Photos 3
Photo 8 β€” Additional Photos 4
Photo 9 β€” Additional Photos 5
Photo 10 β€” Additional Photos 6
Photo 11 β€” Additional Photos 7
Photo 12 β€” Additional Photos 8
Photo 13 β€” Additional Photos 9
Photo 14 β€” Additional Photos 10
Photo 15 β€” Additional Photos 11
Photo 16 β€” Additional Photos 12
Photo 17 β€” Additional Photos 13
Photo 18 β€” Additional Photos 14
Photo 19 β€” Additional Photos 15
Photo 20 β€” Additional Photos 16
Photo 21 β€” Additional Photos 17

Download / Print PDFEdit Before Printing