Project Tiger · Dhaly Infratech → Alliance Computers Limited · Generated 25-Oct-2026 18:16 BD time
45%Form Completion 0/0Checklist OK 0Open Snags 0Total Snags 0Photos Attached
Incomplete: the following expected fields were left blank in this submission β€” Site Type, BTS Type, Site Sharing, Site Photo, DG Meter Photo, Fuel Gauge Photo.

Site & Handover Details

Site CodeDHK_X1097ZoneSylhet
HOTO Date2026-09-01DistrictNarsingdi
Handover OrgDhaly InfratechTakeover OrgAlliance Computers Limited
Handover PersonHossainTakeover PersonMosharof
Handover Phone01715163812Takeover Phone01781409484
Inspected ByMosharofSecurity Guard—
Access Key Handed Over—Site TypeNot Filled
BTS TypeNot Filled
Shared with OperatorNot FilledShared Operator Name—

Generator Information

DG BrandFG WilsonGenset Asset No.—
Capacity (KVA)30Type—
Fuel Tank Capacity2000Present RH7371
Fuel (no water)183 LFuel (total)183 L
Water Amount— LFuel Amount (word)—
DG Site TypeStandardDG Locked After Fueling—
DG Present StatusOK Genset ON AlarmOK
Battery Brand—Battery Serial—
Battery AH160Engine Serial—
ATS Brand—ATS ModeAuto
RH Meter Type—Last Service Date—
Key Type—Key Status β€” BTS—
Key Status β€” DG Room—
Active DG—Connected Fuel Tanks—
Faulty/Disconnected DG—Faulty/Disconnected Tanks—

Snags Found (0)

No snags logged for this visit.

Deficiencies & Safety Remarks

DG Major Deficiencies—
Safety Remarks—
General RemarksDigitized from scanned paper HOTO checklist (Narsingdi zone backfill). NOTE: handover date not legible on original form -- estimated from batch pattern, needs Narsingdi team confirmation. | PDF checklist notes: Site ID header written on the form as 'DHK-1097' (missing the 'X' seen in the filename DHK_X1097) - flagging for human verification this is indeed the same site. Site Address field left entirely blank. DG last servicing date field also left blank. Battery brand/SN field left blank. 'No of active DG / connected fuel tanks / faulty disconnected DG / faulty disconnected tanks' rows all left blank (unlike most other sites in this batch which had 'Active' scrawled in). Checklist for Disconnected generator and spare parts table is empty - no snags recorded. All connected-generator checklist items marked OK. Fuel calc note: Total fuel=(122x122x12.3)=183 liters, matching the 183L entered. Handover Status: 'Completed' has a checkmark. Handing-over vendor name is crossed out/struck through and rewritten as 'Mir Hossain' with phone 01715163312.

Site Photos

No Photo
Not Filled Site / Nameplate
No Photo
Not Filled DG RH / Meter
No Photo
Not Filled Fuel Gauge
Hossain
Handed Over By · Dhaly Infratech
01715163812
Date:  
Mosharof
Taken Over By · Alliance Computers Limited
01781409484
Date:  
 
BL Concern · Name / Signature
 
Date:  

Download / Print PDFEdit Before Printing